. AI043030
Question: Councillor B. Dennehy
"To ask the Chief Executive to outline the progress on agreeing with the
Developer the proposed entrance / access from the Main Street, Rush into
the proposed commercial development on the Main Street Rush and what
is the timetable for commencement of the layout / works required to
construct / modify the existing road network in from of the proposed
commercial development?”
Reply:
There have been long and detailed discussions with the developer’s
engineers regarding the design of the entrance to the proposed
commercial development. The discussions have considered the necessity
for a short right-turn lane for traffic turning into the development and the
consequent changes to the car parking, bus stops, footpath, and
pedestrian crossing points. The developer’s engineers have been aware of
the Council’s requirements for some time but have yet to submit the final
drawings for compliance. The outstanding issues are matters of detailed
design and should be easily resolvable. The timetable for implementation
depends on the developer.