Great to see the work start on installation of the two VAS signs I lobbied for either side of the Rush / Lusk Train Station.
When the ESB have completed the wiring of the Pedestrian Crossing followed by the commissioning process the three items combined should bring a safer pedestrian crossing along with helping to bring some improved degree of safety by traffic calming to the area for motorist entering and exiting the Train Station.
Comentarios